4. Tasks

A backlog items consists of an arbitrary number of tasks. You can insert a task by selecting the menu item Add task in the context menu or by clicking the short cut Ins. The title of the task must be unique in the backlog item. By default the title of the new task will be created from the default value set in the options dialog (see Section 1.7, “Default values�).

You can assign tasks to team members. If there is only one team member in the product all newly created tasks will be assigned to this team member. The status of a task can have one of the following values not started, in progress, to verify, done, undone or impeded. If a task is marked as done you can't change its values. In this case you must set the status to something different from done and then you can change the tasks values. You can only assign tasks to a sprint (not backlog items). A task can only assigned to one sprint. It is not required to assign all tasks of a backlog item to the same sprint. In the working date table in the tab Working date the timekeeping of the task will be displayed. This table can't be changed. The timekeeping is explained in Section 1, “Time recording�.

You can attach an arbitrary count of attachments to a task. If the attachment is an image in the format PNG, GIF or JPEG it will be displayed. If the attachment is not an image it can directly opened if the application is registrated in the operating system.

Figure 5. Attachments

Attachments

[Important] Important

The file size of each attached file is limited to 16 MB. If you store your product backlog in an XML file there are no size limitations.

You can insert a new task by clicking the key Ins in the text field Title. The newly created task will be selected and you can immediately change the title.

If you are within the view Product backlog (see Figure 1, “Product information�) you can change the assignment of the tasks to a backlog item by drag and drop. It is only possible to select one task.

If you press the button the current sprint will be assigned to the selected task. If no sprint takes place the empty sprint will be assigned.

If you select a task in the tree view you can insert a task via the context menu or the short cut Ctrl+C and paste a task via the context menu or the short cut Ctrl+V. If you insert the task in the same backlog item an unique title will be created. You can only insert the task if you have selected a backlog item first.

[Note] Note

Tasks that are done are editable after you change the status to something else than done. If you have selected a done task the tool bar in the description field is hidden.